Updating Views

You need to update the representation whenever there are any changes done in the 3D product or in any of the text attribute links. This task shows you how to:


Before you begin:

Open an existing product and the associated drawing representation. Modify the 3D area or modify a text attribute link.

See Also
About Update and PLM Update
Updating Drawings Including the Bills of Materials Using the Batch Monitor

Update symbols must appear in the tree to indicate the drawings , sheets and views that need to be updated. The Update current sheet and the Update must be active.

Note: To avoid updating a drawing when only minor changes have been performed in the 3D area, Update symbols will not be active after a change in the 3D color or 3D point symbol, when these are inherited from the 3D area (as specified in the Generation Properties of the Properties dialog box).