At the Machining Operation LevelThe definition of synchronization statement in APT. If Rough turning (Start) is synchronized with the Rough turning (Start) and the Master channel is defined as the first channel. Synchronization dialog box:
If the Rough turning (Start of Retract) is synchronized with the Rough turning (Start) and the Master channel is defined as the first channel. Synchronization dialog box:
At the Pass LevelIf leading Rough turning.1 is synchronized with lagging Rough Turning.2 for End of LiftOff and with a Delay of 10 mm. Synchronization dialog box:
|