Using the APT Syntax for Synchronization

The APT syntax is described below with regard to different synchronization levels.

This page discusses:

See Also
Creating and Editing Synchronization

At the Machining Operation Level

The definition of synchronization statement in APT.

If Rough turning (Start) is synchronized with the Rough turning (Start) and the Master channel is defined as the first channel.

Synchronization dialog box:

  • MO Level
  • RoughTurning.1
  • <- Start
  • RoughTurning.2
  • <- Start
  • Turret_Product35871.1

The APT output is

If the Rough turning (Start of Retract) is synchronized with the Rough turning (Start) and the Master channel is defined as the first channel.

Synchronization dialog box:

  • MO Level
  • Start of retract
  • <- Start
  • RoughTurning.2
  • <- Start
  • Turret_Product35871.1

The APT output is

At the Pass Level

If leading Rough turning.1 is synchronized with lagging Rough Turning.2 for End of LiftOff and with a Delay of 10 mm.

Synchronization dialog box:

  • Pass Level
  • RoughTurning.1
  • RoughTurning.2
  • Lagging activity - Rough Turning.2
  • End point - End of LiftOff
  • Delay distance - 10
  • Retract at once
  • Turret_Product35871.1

The APT output is: