-
Click General System
to create a workplan system in the
Routings block of the dashboard.
-
Create operations under the workplan system.
-
In the Manufacturing Items View, drag the root
manufactured item to the root general system in the
Routings block.
-
From the Authoring section of the action bar, click Create Link
. In the Create Link panel that
displays, click Realized Manufactured Item
.
The root manufactured item linked to the root system displays in the
Manufacturing Items View.
-
From the Authoring section of the action bar, click Create Link
. In the Create Link panel that
displays, drag a resource to an operation in the Routings
block.
-
In the Create Link panel, click Primary Capable
Resource
.
Note:
Secondary Capable Resource
creates a secondary capable resource link for the
operation, if the operation has a primary resource.
The consumed resources display in the
Capable
Resources block. The
Routings column shows
the operations linked to the resources.
- Optional:
Click Attach Document
to attach a document to each operation.
Documents can be attached to each operation to help detail each step of the
manufacturing process. Documents attached to operations display in the
Documents column.
A manufactured item structure is associated to a system, and
resources are assigned to operations.