Revising a Specification

Users with Revise access for specifications can revise a CAD model, part specification, CAD drawing, or drawing print.


Before you begin: To revise a specification:
  • You must have either the Author or Leader role for the specification. (App-specific role: Design Engineer, Senior Design Engineer, Component Engineer, Product Obsolescence Manager, Part Family Coordinator).
  • You must either have created, now own the specification, or be assigned to the same collaborative space in which the specification resides.
Note: If you revise a production part and its specification files, you must manually connect the new revision of the specification files to the new revision of the part.
See Also
Revisions of a Specification
  1. Access the specification's Properties page. For details, see Specification Properties.
  2. From the tabs, click Revisions to show a page containing basic information about revisions that have been created for the object.
  3. To create a revision of the specification, click Revise from the page toolbar. Only users with Revise access for specifications will see this link.
  4. Make changes, as necessary. The following can be changed:

    Field Description
    Revise With Files Check the box to create the new revision and connect files that are connected to the context object to the revision.
    Description Type details that describe the specification.

  5. Click OK.