| Description | Type details that describe the
ECO. |
| Category of Change | Select a category from the drop-down list. It can be any of the following: Unassigned, Vendor Requirement, Product Improvement, New Production Introduction, Marketing Requirement, Facilitate Manufacturing, Drafting Error, or Cost Reduction. |
| Reported Against | Click to search for a part or document. |
| Responsible Design Engineer | Click to modify the user in the Design Engineer role who is authorized to promote the ECO to the Design Work state. |
| Reviewer List | Click to modify the route template that contains the list of people to review the ECO. The Reviewer List cannot be changed after the Create state. |
| Approval List | Click to select the approval route template that contains the list of people to participate in the approval process of the ECO. |
| Distribution List | Click to select a list of members to receive notifications about the ECO. |
| Severity | Select High, Medium or Low to assign a priority status for the ECO. The default is Low. |