-
In
the Assembly Evaluation app, play the track and verify that the track moves two products.
-
Edit the track and go to the Moving Objects panel.
-
In the panel, verify that the two products are assigned to the track.
The second product is from a previous operation.
- Change to the Process Planning app.
- Drag the operation and drop it under the system.
A message provides the name of operation occurrence which is now reconnected with the track. - Verify in the Gantt that the links between the operations are automatically reconnected.
- Open the Assembly Evaluation app again.
- Play the track and verify that the track still moves the two products.
|