Moving Operations with Linked Tracks

You can drag and drop operations from one system to another system. All tracks referencing the moved operations are kept. A track can move products that are implemented by the owning operation and previous operations.


Before you begin: In this scenario, the track under LoadingOperation.23 moves a product implemented by the operation. It also moves a product implemented by a previous operation LoadingOperation.22. When you switch to the the Process Planning app, and you drag and drop LoadingOperation.22 in the tree, the links to the tracks are kept. You can verify this by playing the track.
See Also
Tracks Linked to Moved Operations
  1. In the Assembly Evaluation app, play the track and verify that the track moves two products.




  2. Edit the track and go to the Moving Objects panel.
  3. In the panel, verify that the two products are assigned to the track.

    The second product is from a previous operation.

  4. Change to the Process Planning app.
  5. Drag the operation and drop it under the system.

    A message provides the name of operation occurrence which is now reconnected with the track.



  6. Verify in the Gantt that the links between the operations are automatically reconnected.
  7. Open the Assembly Evaluation app again.
  8. Play the track and verify that the track still moves the two products.