Basic |
Owner
|
Name of the control owner. |
Receipt Date |
Date the control was created. |
Modification Date
|
Date the control was last modified. |
Status | State of the control. Possible states are In Process, Review, Verified, and Complete. |
Additional Information | Impacted item | Name of the impacted item for which the product control is created. |
Entry Type | Entry type of the control. Possible types are Bounding, Incident, and Pending Bounding. |
Work Order #
| Assigned work order number. |
Lot Number | Lot number of the control. |
Run Number
| Run number of the control. |
Hold Location | The physical location of the impacted item reported in the control. Possible values are Distribution Center, Finished Goods, In Process, and Incoming Raw Materials. |
Total Qty
| Total quantity of the impacted item in a batch. |
Total Qty UOM | Unit of measure of the total quantity. |
Defective Qty
| Quantity of defective impacted items. |
Defective Qty UOM | Unit of measure of the defective quantity. |
Sample Qty
| Quantity taken as sample for the quality check. |
Sample Qty UOM | Unit of measure of the sample quantity. |
Defect %
| Percentage of defective impacted item with respect to the total quantity. |
Item Code | Part number or code assigned to the impacted item reported in the NC. |
Item Description
| Description of the impacted item reported. |
Completion Date | Date the control is promoted to the Complete state. |
Disposition | Proposed Disposition
| Proposed method to dispose the defective impacted item. |
Instructions | Instructions to dispose the defective impacted item. |
Rationale | Reason to dispose the defective impacted item. |