You can select certain materials or parts brought up to date without
performing a global rollup.
Selected parts or materials can be brought up to
date with the "Roll Up Compliance Data" action on the following pages:
Material and Parts list pages
Material and Parts Properties pages
The Roll Up Compliance Data action is enabled when the
selected items are out-of-date and need to be rolled up. If the user attempts to access a
function such as an export or report that requires data to be up to date, the following
message displays: "This action cannot be accessed because at least one of the selected items
is out of date. Use the Roll Up Compliance Data action to bring them up to date."
For
single item views, the message reads: "This action cannot be accessed because the selected
item is out of date. Use the Roll Up Compliance Data action to bring it up to
date."
When the Enable Parallel Roll Up option is enabled, each
root node is processed in the separate thread. If the more than one thread is available, the
number of root nodes are processed simultaneously.
Required access roles:
Baseline: Author, Reader
App-specific: Compliance Engineer
On a parts or materials list page, confirm the parts or materials for the
rollup.
From the page toolbar, click Compliance > Roll Up Compliance Data.
The Monitor Progress page displays, showing status about the rollup. See Background Jobs Page.