Received Material Declarations List

Once a reported part has been created or imported for a material declaration, the state of the material declaration is promoted to Received.

Required access roles:

  • Baseline: Author, Leader, Reader
  • App-specific: Compliance Reviewer, Compliance Engineer, Senior Compliance Engineer

To access this page:

  1. List the app categories for Materials Compliance Management.
  2. In the navigation pane, click Received Material Declarations.

This topic describes:

This page discusses:

See Also
In Other Guides
Page Toolbar Icons

Columns

Column Name Description
Material Declaration Name The name of the material declaration and all MEPs under the material declaration. (This field is an auto-generated string.)
Equiv Ref Weight The equivalent reference weight for the part from this supplier.
Enterprise Part Name The name of the enterprise part referenced to the MEP.
Enterprise Part Revision The revision of the enterprise part referenced to the MEP.
Manufacturer Part Name The manufacturer part name.
Manufacturer The name of the part manufacturer.
Manufacturer Location The location of the manufacturer.
State The state of the material declaration or MEP.
IMDS Request Pending. Whether a request is pending from IMDS for this material declaration.

Request ID. If a request is pending, this is the IMDS request ID.

Request Type. The IMDS request type.

Project. The project associated with the request.

Direct Upload Status. The IMDS upload status.

Due Date The due date of the material declaration.
Received Date The date on which the material declaration was received.
Accepted Date The date on which the material declaration was accepted.
Rejected Date The date on which the material declaration was rejected.
Submission Format The format used for the submission, for example, Compliance Connect.
Import File Name The name of the imported file.
Owner The owner of the material declaration.

Actions/Toolbar Commands

Action Description For More Information
Compliance Runs the compliance report on parts in the material declaration. Compliance Report
Recyled Content Runs the Recycled Content Report.

You must have the Author/Leader or Compliance Engineer/Senior Compliance Engineer access role.

Generating the Recycled Content Report
Compliance Scorecard Runs the compliance scorecard report on parts in the material declaration. Running the Compliance Scorecard Report