Replacing Manufacturing Parts in an MBOM

You can replace a manufacturing part in an MBOM. If the MCO associated with the part is in the Create state and the MBOM status is pending, the part can be replaced without a change order context.

Parts that are removed (or replaced) from a released MBOM are not listed in the MCO. The MCO filter displays only those parts that have been added to the MBOM.


Before you begin: Access a part Bill of Materials page in MBOM Plant-Specific edit mode (Current & Pending view). See Editing Part Bill of Materials - MBOM Plant-Specific
See Also
Adding Manufacturing Parts to a BOM
  1. Select the part that you want to replace.
  2. From the page Actions menu or toolbar, click Replace Part.
    The Search panel opens.
  3. Search for and select the part to replace the existing part and click Submit. If the part to replace the existing part does not have a BOM structure, the Replace With Existing form opens. Select one of the following and click Done:
    • Replace with No BOM. Replaces the part and BOM structure with the new part.
    • Replace with BOM of Existing Part. Replaces the part with the new part and copies the BOM structure of the existing part to the new part.
    The BOM page redisplays in edit mode, where you can make changes to the attributes for the parts you added. The replaced part details are changed to red strikethrough text with in front of the part name. The replacement part details are shown in green text with in front of the part name.

    The following attributes can be changed:

    ColumnDescription
    F/NBy default, the find number of the replacement part is set to the same as the replaced part.
    Ref DesEnter the reference designator for the MBOM connection.
    Component LocationEnter the component location for the MBOM.
    QuantityEnter the number of parts of the same kind to be added in the assembly.
    UsageThe default usage options are: Standard, As Required, Per Sales Order, Reference, Reference-Eng, Reference-Mfg.