In the
navigation pane
for a project, click
Schedule >
Flattened View.
Name. The name of the task. You can hover
over the name to see its description.
Type. This could be Task, Phase,
Gate, or Milestone. The type is Task for all tasks
and subtasks. Your system may be set up with additional task types.
Id. An integer that identifies task dependencies. Unlike the task
number, the ID does not represent the task's level in the hierarchy. Because
it is an integer, the ID is a more concise way to identify the tasks.
Level. The task's order in the hierarchy. Integers represent top-level
tasks. Second-level tasks have one decimal, third level tasks have two
decimals, and so on. A critical task (one that cannot be delayed without
affecting the project finish date) is identified by .
Parent. The parent task, if it exists. The parent task has a link.
Predecessor. Lists any dependencies defined for the task. Dependency
abbreviation uses this convention:
Task ID: [Dependency Type] [Number of Slack Days, if any]
Multiple dependencies have with a comma separator. For more details about
dependencies and the syntax, see About Task Dependencies.
Successor. If the project is scheduled from the Finish Date, then
successors drive predecessors.
State. A task can be in one of the
following states.
- Draft. The task has been created and an assignee specified. When a Project Lead is ready for
work to begin on a task, the Lead promotes it to To Do.
- To Do. The system notifies assignees.
- In Work.
The assignees have begun work on the task. The system automatically promotes a
task to
In Work
when the % Complete is changed from 0% to any percentage less than 100.
- In Approval. Project members are reviewing and approving the task and its deliverables. When
100% is entered for % Complete, the system automatically promotes the
task to In Approval. Typically, an assignee creates a route to have
route members review the task.
- Completed. The task is completed. The system automatically promotes a task to Completed when
an assignee or Project Lead enters an Actual Finish Date.
Estimated
Duration / Start Date / End Date. The dates on which the task is
expected to start and end. The duration is the number of days (d) or hours
(h) between the start and end dates. Note:
If in project preferences the
project duration has been changed from "Days" to "Hours," in the task
structure the hours appear only in the Project row for the Estimated
Duration and not for all tasks.
Constraint Type.
The type of constraint for this task, which specifies
when the task should be completed within the project.
Values can be "As Late as Possible," "As Soon as Possible," "Start
No Earlier Than," "Finish No Earlier Than," "Start No Later Than," "Finish No
Later Than," "Must Finish On," or "Must Start On."
Constraint Date. Constraint Types other
than "As Soon as Possible" or "As Late as Possible" have a constraint date.
Float / Total / Free. Total float is the amount of
time that the task can be delayed without delaying the project. Total Float
= LS (Late Start) – ES (Early Start). It is also calculated by LF (Late
Finish) – EF (Early Finish).
Free float is the amount of time that a task can be delayed without delaying
the early start date of a successor task or violating a schedule constraint.
Free Float = Lowest ES (Early Start) of successors – EF (Early Finish) of
the task.
-
To quickly create new tasks (tasks, gates, milestones, phases),
use the "Quick Task Creation toolbar:"
The "Quick Task Creation toolbar" is not available for the mobile
app.
-
Click the task in the schedule for which you want to add
another task above.
-
Select the
Type of task (Gate, Milestone, Phase,
Change Task, Task) you want to add.
-
Select the number of tasks in the
No field.
-
Click
to insert the tasks above.
-
To delete tasks, select one or more tasks and click
.
-
Edit cells in the schedule. (For more details, see
Editing the Task Schedule.)
-
Click
Enable Edit
on the page toolbar.
Most cells are editable. While you edit,
Project Management
visually displays the proposed changes but does not make those changes until
you click
Save.
-
To edit a cell, click the cell and change the value. Depending
on the type of data, you edit the cell as follows:
- Select an option from a list.
- Use the calendar tool to change a date. The calendar shows nonworking days based on the
events set in the company calendar for the location of the task
owner and task calendar. All nonworking days are highlighted in
yellow color. If no events have been set, by default Saturday
and Sunday are nonworking days and are not shown with any visual
cue.
- Type a new value.
For Duration, enter the updated duration,
followed by a space and then d or
D for days or
H or h for
hours. For example, "15 d". If you omit the d/h, the default
is days.
Updates to the Estimated Start Date or
End Date might cause conflicts
with predecessors, successors, or constraints on the parent
task. If this is the case, after you click
Save, an alert message will
display that contains the conflicts and the reasons for
committing a different date than the selected date. Note the
following logic about date changes:
- For a dependency, enter the value (can be a comma-separated list) following the syntax
defined in About Task Dependencies.
- Click
Save to save the changes or
Cancel to reset cells back to their
original values.
-
To perform a mass update in which you can apply a change to
all tasks or only to selected tasks:
- Select the item you want to update from the Mass Update list in the
page toolbar.
These attributes can be updated: Name, Type, State, %,
Duration, Start Date, End Date, Constraint Date, and Constraint
Type. Note:
You cannot mass promote tasks to "In
Approval/Completed" states using the Mass Update "State"
list value.
- Type the changed value in the data entry box.
- To apply the value to one or more selected cells, click the
check boxes for the tasks/subtasks in the left pane, and then click
Apply to Selected. This only updates
those objects that are selected. Only rows that are visible and selected are
updated. Any collapsed rows, even if the parent node is selected, will not be
updated.
- To apply the value to all cells, click Apply to All.
This updates all objects on the page whether or not checked.
For example, to change the state of all tasks, select
State from the list, and then
choose the specific state in the lower list, for example,
In Work. Then click
Apply to All.
- Optionally edit any individual cells with values different
from the mass update values.
-
To exit Edit mode, click
Disable Edit.
-
Click
to manually roll up task information. This icon appears only
when "Manual" is selected as the schedule rollup method in project preferences.
See
Editing Project Preferences.
When the rollup method is set to "Manual," the following actions
are excluded from rollup behavior:
- Create a task from quick/dialog
- Delete a task from quick/action toolbar
- Modify estimated duration, start, and end date from the schedule
- Modify actual start/finish date
- Modify state
- Cut/copy/paste
- Duration Keyword actions
-
Click to
calculate float values and the overall critical path.
-
Navigate the view using the controls in the lower-right corner:
The display shows the number of objects in the project. You can
select to view another page, move to the previous or next page, or turn off the
pagination controls.
|