The status of the test is assigned to the test result status field. Typically, the test engineer is assigned a test execution task and creates the test results. While working on the task, the test engineer moves the test execution from Ready to InWork. During the InWork state, the test engineer creates test results and specifies the test results status. Test Results and Access LevelsTest results (and all test objects) belong to specific content categories. The category of content, along with your access level, determines what actions you can take on the various types of content. |