You can place the standard and contextual components at the required locations.
Some components are directly positioned and fixed on a part such as a floor. These components are positioned before the design of a covering.
Some components are positioned on the covering and moveable like chairs. These components are positioned after the design of a covering.
You can place the components on the steel outfitting system and foundation.
Positioning Standard Components Positioning Contextual Components