Stepping Through Product BuildUp and Work Instructions

You can use Play on the Compass to step through the product buildup with the work instructions.


Before you begin: If you want to see the product buildup that includes both the active system and any previous system, set the Work Instructions Options to include previous systems.
  1. In the Compass, click Play.

    Each operation in the Operation Sequencer is highlighted in sequence. As an operation is highlighted:

    Notes:
    • If you have parallel operations, the first operation that appears in the parallel operation displays its work instruction first The next operation down displays its work instruction, and so forth. This is until all the operations down the vertical (parallel) operation view have had their work instructions displayed. Then the next operation in the Operations Sequencer is displayed.
    • If more than one work instruction is associated with an operation, each work instruction is shown for 5 seconds, in the order it appears on the operation.
    • If an operation does not have any work instructions, the simulation jumps to the next operation that has work instructions, until the simulation ends.

  2. When the simulation ends, move the slider to the left until it settles on an operation whose buildup and work instruction you want to review.
  3. On the Compass, click Play again.
    The simulation mode ends.