-
In the
Compass,
click
Play.
Each operation in the
Operation Sequencer is highlighted in
sequence. As an operation is highlighted:
Notes:
- If you have parallel operations, the first operation that appears in the parallel
operation displays its work instruction first The next operation
down displays its work instruction, and so forth. This is until
all the operations down the vertical (parallel) operation view have had their work
instructions displayed. Then the next operation in the
Operations Sequencer is displayed.
- If more than one work instruction is associated with an
operation, each work instruction is shown for 5 seconds, in the order it
appears on the operation.
- If an operation does not have any work instructions, the
simulation jumps to the next operation that has work instructions, until the
simulation ends.
-
When the simulation ends, move the slider to the left until it settles on an
operation whose buildup and work instruction you want to review.
-
On the
Compass,
click
Play again.
The simulation mode ends.
|