You can group all the tests at each timepoint for the same activity across all
storage conditions and materials into a single Foundation Hub task so that you can execute them together. This does not affect the amount of material
required, but simplifies the Task Plan by grouping all Samples under a single
Task.
-
Select the
Test Design tab of a study where the materials, the matrix of time
points and storage conditions, and the tests are already designed.
-
Click Use Sample Grouping above the test design.
This setting applies to all conditions, materials, and tests in the study.
This displays Use Sample Grouping with a blue
background.
-
To save your changes to the study, click Apply.
When you activate the study, the Task Plan in Foundation Hub has a single Task for all Samples for each test and storage condition at each time point.
After activation of the study, you can manage the single task using the standard Foundation Hub actions, including splitting the task. The heat map on the
Monitoring tab of the study displays the same status for all tests
represented by the single Task, unless it is split.