Use Existing Storage Conditions
You can select existing conditions from a list.
-
Select the
Storage Conditions tab of a study or click for the Storage
Conditions table on the Test Design
tab.
This displays the lists of template available conditions and any selected storage conditions and challenges.
-
Select the conditions to include in the study.
Tip: Click to remove selected conditions. The list of selected storage conditions updates with the added conditions. If you add the same template conditions more than once, the Name indicates the number of the duplicate conditions. The tooltip for the in each row reports the Arm Start Date for that condition. This is the date and time for insertion of the required samples into the storage conditions chamber, automatically defined as the start date for the study.Tip: To change the arm start dates for an active study's materials and storage conditions, use the Reset Start Date action on the Samples tab of a Foundation Hub Task Plan, or the Reset Study Arm Start Date Pipeline Pilot protocol in the Pipeline Pilot Web Port. - To save your changes to the study, click Apply.
-
When you have defined all the required conditions, proceed to choose the
activities for the study.
For more information, see Defining Activities.
Do one of the following:
- Click the Activities tab.
- Click to the right of the form.