Generating Reports for a Study

When you activate a study, you can generate various reports throughout its lifecycle to monitor the progress or view the results of the Tasks in its Foundation Hub Task Plan. You can also run a Stability Study Design Report and the Stability Study Audit Report on a study before its activation. For a study that is not yet active, you can only generate the Stability Study Design Report if its Test Design is complete and it includes at least one time point, one storage condition, and one activity. You can generate a Stability Study Audit Report for any study.

See Also
Introductory Concepts
Monitoring a Study
  1. Select the Monitoring tab of the study.
  2. Click Report at the bottom of the page.
  3. In the reporting dialog box, select the Pipeline Pilot Protocol to use for generating the report.
  4. Click Run.
  5. View the report and save it in PDF, Word, or Excel format, if required.

    The Stability Study Audit Report is not available in Excel format.

Note: The localization in Excel reports depends on the language settings for your computer.
Tip: At any time after initial activation of a study, you can access other reports as actions on the Samples tab of a Foundation Hub Task Plan or in the Pipeline Pilot Web Port. Only users with the Reader, Collaborator, or Owner access role for the study can generate reports by any of these routes.