Primary Area

The primary area of the Authoring section provides commands for starting basic actions, such as planning, extracting, opening, and so forth, on central planning components.



Part Planning
Enables part planning from the product structure.
See Part Planning.


Weld Planning
Enables weld planning from product structure.
See Weld Planning.


Generate Features
Generate features for a manufacturing assembly.
See Generate Features.


Feature Manager
Manages the features of a selected manufactured item.
See Review or Modify Generated Features Using Feature Manager.


Manage Capable Resources
Associates resources and related documents to a manufactured item.
See Assigning Resources Using Managing Capable Resources.


Synchronization Manager
Synchronizes the status between the EBOM and the MBOM.
See Synchronizing Design Changes.


Extract Workshop Documents
Extracts workshop documents of a selected manufactured item.
See Generating Workshop Documents.


Manufacturability Check
Check a manufacturing part to verify the manufacturability of its predecessors.
See Manufacturability Verifies Against Assigned Resources.


Load Resulting Products
Loading the resulting products perform automatically when the app is in transition. This load may take longer when the size of the resulting product structure is large. Now you can load them partially at the app transition or on demand. This is also available when you RMB on an item in the Specification tree.
See About Loading Resulting Products.
Documents
Loading documents.