Workplan
- See Flyout for Creating Systems.
|
|
-
Header Operation
- See Flyout for Creating Operations.
|
|
- Create Text Instruction
- See Flyout for Creating Instructions.
|
|
-
Create Time Analysis
- See Flyout for Managing Time Analysis on an Operation.
|
|
- Manage Process Scopes
- Creates, deletes, or reconnects a System-Item scope, a System-Workplan scope, or a Workplan-Item scope.
- Right-click a system or a workplan to access the command from the context menu.
See
Defining a System-Item Scope.
|
|
-
Assignments Manager
- See Flyout for Managing Assignments and Links.
|
|
- Create Product
Flow
- Creates a product flow between two
systems, between two operations, or between a system and an
operation.
- A product flow is created from the first selected object to the second one.
See
Creating a Product Flow.
|
|
-
Create Precedence Link.
- See Flyout for Creating Precedence Links.
|
|
-
Tree
Reordering
- See Flyout for Managing the Display of PPR Content.
|
|
- 3D
View
- Displays the 3D representation of the
selected PPR object.
-
The 3D View lets you visualize:
- The 3D representation of a product or resource
- The build-up of an item, system or operation.
See
Using the 3D View in Process Planning.
|
|
- Relations
- Displays the
selected object's relations with other objects in the current
session.
- The panel displays relations
such as scope links, implement links, data requirements, precedence
constraints, product flows, and time constraints.
See
Listing Related Objects in the Relations Panel.
|
|
- Process
Gantt
- Displays a tree view and a flow view of systems and operations, and provides
information about systems, operations, parts, fasteners, and resources.
- Select a
system.
The Gantt chart displays systems and their operations, and can be used to
create operations and constraints between operations.
See
Using the Process Gantt Chart.
|
|
- Workload
Balancing
- Balances operations between
systems using a bar chart.
- Select a system.
A panel appears comprising a bar chart and a table showing
system information and operations sequencing. In the bar chart, drag
rectangles, which represent operations, to balance the workload between systems.
See
Balancing Workloads on a Selected System.
|
|
- Premises
Usage
- Applies a production demand and a
shift model to compute the weighted time of operations.
- Select a system, then select:
- the production demand (that is, the quantity to be manufactured) for a number of
items and configurations
- shift models containing shift schedule information.
The weighted time of the operations is displayed in the Gantt chart and Workload
Balancing panel.
See
Working with Premises.
|
|
- PPR Spreadsheet Editor
- Starts the PPR Spreadsheet Editor.
- Lets you browse and edit the planning and simulation data in a
spreadsheet view.
See
Using the Spreadsheet.
|
|
- Documents
- Allows you to attach or detach Attachments or Specifications
to an object and preview them in another panel.
- See, Social and Collaborative
Apps
| Enterprise Modeling and Execution | Document
Management for Dashboard | Information Tabs |
Attachments.
|