Flyout for Creating Items
 |
- Manufacturing
Assembly
- Inserts a Manufacturing
Assembly.
- Select an item to
create the Manufacturing Assembly as predecessor.
See
Creating a Manufactured Item.
|
 |
- Provided
Part
- Inserts a Provided
Part.
- Select an item to
create the Provided Part as predecessor.
See
Creating a Manufactured Item.
|
 |
- Transform
- Inserts a Transform
step.
- Select an item to create the Transform step as predecessor.
See
Creating a Manufactured Item.
|
 |
- Fasten
- Inserts a Fasten step.
- Select an item to create the Fasten step as
predecessor.
See
Creating a Manufactured Item.
|
 |
- Installation
- Inserts an Installation.
- Select an item to create the Installation as predecessor.
See
Creating a Manufactured Item.
|
 |
- Manufactured
Material
- Inserts a Manufactured
Material.
- Select an item to
create the Manufactured Material as predecessor.
See
Creating a Manufactured Item.
|
 |
- Manufacturing
Kit
- Inserts a Manufacturing
Kit.
- Select an item to create
the Manufacturing Kit as predecessor.
See
Creating a Manufactured Item.
|
 |
- Manufactured
Part
- Inserts a Manufactured
Part.
- Select an item to
create the Manufactured Part as predecessor.
See
Creating a Manufactured Item.
|
 |
- Existing
Item
- Inserts an existing
item.
- Select an item then select an existing item using the search box in the top
bar.
See
Inserting an Existing Item.
|
Flyout for Creating Remove Material Steps
Flyout for Creating Operations
Flyout for Creating Instructions
 |
- Create Text Instruction
- Creates a text instruction using rich text content.
-
Note:
See the Work Instructions User's Guide.
|
 |
- Create Data Collect Plan Instruction
- Creates a work instruction that directs workers to
provide information such as inventory tracking or defect
counts.
-
-
Note:
See the Work Instructions User's Guide.
|
 |
- Create Data Collect Checklist Instruction
- Creates a data collect composed of boolean checks to be
performed.
-
-
Note:
See the Work Instructions User's Guide.
|
 |
- Create Sign Off Instruction
- Creates a work instruction that requires a sign off as
part of the work process.
-
Note:
See the Work Instructions User's Guide.
|
 |
- Create Alert Instruction
- Creates an alert work instruction whenever you want to
warn workers about safety or equipment concerns in an
operation.
-
Note:
See the Work Instructions User's Guide.
|
 |
- Quick Edit
- Edits a work instruction as part of the work
process.
-
Note:
See the Work Instructions User's Guide.
|
Flyout for Inserting Resources
 |
- Area
- Inserts an Area resource, which is an organizational
resource.
- Select a parent in the resource structure where you want to create the Area
resource.
See
Inserting a Resource.
|
 |
- Manufacturing
Cell
- Inserts a Manufacturing Cell resource,
which is an organizational resource.
- Select a parent in the resource structure where you want to
create the Manufacturing Cell resource.
See
Inserting a Resource.
|
 |
- Robot
- Inserts a Robot resource, which is a working
resource.
- Select a parent in the resource
structure where you want to create the Robot resource.
See
Inserting a Resource.
|
 |
- Worker
- Inserts a Worker resource, which is a working
resource.
- Select a parent in the resource
structure where you want to create the Worker resource.
See
Inserting a Resource.
|
 |
- Transport
- Inserts a Transport resource, which is a working
resource.
- Select a parent in the resource
structure where you want to create the Transport resource.
See
Inserting a Resource.
|
 |
- Conveyor
- Inserts a Conveyor resource, which is a working
resource.
- Select a parent in the resource
structure where you want to create the Conveyor resource.
See
Inserting a Resource.
|
 |
- NC Machine
- Inserts an NC Machine resource, which is a working
resource.
- Select a parent in the resource
structure where you want to create the NC Machine resource.
See
Inserting a Resource.
|
 |
- Industrial
Machine
- Inserts an Industrial Machine
resource, which is a working resource.
- Select a parent in the resource structure where you want to
create the Industrial Machine resource.
See
Inserting a Resource.
|
 |
- Inspect
- Inserts an Inspect resource, which is a working
resource.
- Select a parent in the resource
structure where you want to create the Inspect resource.
See
Inserting a Resource.
|
 |
- Control
Equipment
- Inserts a Control Equipment
resource, which is a working resource.
- Select a parent in the resource structure where you want to
create the Control Equipment resource.
See
Inserting a Resource.
|
 |
- Logic
Controller
- Inserts a Logic Controller
resource, which is a working resource.
- Select a parent in the resource structure where you want to
create the Logic Controller resource.
See
Inserting a Resource.
|
 |
- Tool
Equipment
- Inserts a Tool Equipment resource,
which is a non-working resource.
- Select a
parent in the resource structure where you want to create the Tool Equipment
resource.
See
Inserting a Resource.
|
 |
- Storage
- Inserts a Storage resource, which is a non-working
resource.
- Select a parent in the resource
structure where you want to create the Storage resource.
See
Inserting a Resource.
|
 |
- Sensor
- Inserts a Sensor resource, which is a non-working
resource.
- Select a parent in the resource
structure where you want to create the Sensor resource.
See
Inserting a Resource.
|
 |
- User Defined
Resource
- Inserts a User Defined resource,
which is a non-working resource.
- Select a
parent in the resource structure where you want to create the User Defined
resource.
See
Inserting a Resource.
|
 |
- Manufacturing
Product
- Inserts a Manufacturing Product
resource, which is a non-working resource.
- Select a parent in the resource structure where you want to
create the Manufacturing Product resource.
See
Inserting a Resource.
|
 |
- Existing Product or
Resource...
- Inserts an existing product or
resource.
- Select a parent in the resource structure then select an existing resource or
product using the search box in the top bar.
See
Inserting an Existing Product or Resource.
|
Flyout for Gantt Charts and Balancing
 |
- Process
Gantt
- Displays a tree view and a flow view
of systems and operations, and provides information about systems, operations,
parts, fasteners and resources.
- Select a
system.
The Gantt chart displays systems and their operations, and can be used to
create operations and constraints between operations.
See
Using the Process Gantt Chart.
|
 |
- Resource Utilization
Gantt
- Displays a tree view and a flow view
of resources and operations, and provides information about operations assigned
to resources, operation times, resource utilization and associated
parts.
- Select a Manufacturing Cell or
Area resource. The Gantt chart displays resources and their assigned
operations.
You can assign operations to resources and set a time mode on operations.
See
Using the Resource Utilization Gantt.
|
 |
- Workload Balancing
- Balances operations between systems using a bar
chart.
- Select a system.
A panel appears comprising a bar chart and a table
showing system information and operations sequencing. In the bar chart, drag
and drop rectangles, which represent operations, to balance the workload between
systems.
See
Balancing Workloads on a Selected System.
|
 |
- Resource
Balancing
- Balances operations between
working resources using a bar chart.
- Select an organizational resource as the parent resource. A panel appears
comprising a bar chart and a table showing:
- information about the working resources
- the operations that are assigned to each working resource.
In the bar chart, balance the operations on the working resources by dragging
and dropping rectangles, which represent operations.
See
Balancing Operations on Working and Nonworking Resources.
|
Flyout for Creating Precedence Links
 |
- Create Precedence
Link
- Creates a precedence constraint between
two operations.
- Select two operations to
create a precedence constraint between them.
The first operation ends before the second one starts.
See
Create a Precedence Link.
|
 |
- Create Start-Start
Link
- Creates a start-start synchronization
link between two operations.
- Select two
operations to create a start-start synchronization link between them.
The two operations start at the same time.
See
Create a Start-Start Link.
|
 |
- Create End-End
Link
- Creates an end-end synchronization link
between two operations.
- Select two
operations to create an end-end synchronization link between them.
The two operations end at the same time.
See
Create an End-End Link.
|
 |
- Create End-Start
Link
- Creates an end-start constraint link
between two operations.
- Select two
operations to create an end-start constraint link between them.
The first operation ends before the second one starts. You can specify a
delay between the two operations.
See
Create an End-Start Link.
|
|