-
Select an Operation, Op30.
-
Select Create
Text Instruction.
-
Click Assignment Manager
.
The Assignment Manager opens for Textual
Instructions, Instruction for
OP30. 
-
Select the requirements for this operation, and Assign Selected
Requirements
.
-
Assign Requirements to OP 40 using Assign Selected
Requirements
.
-
Select
-
Select Product BuildUp options
and make sure the Show FT&A
is ON.
-
Select OP 30.
|