| Type | Select the type of part you want to create. Click  if you are creating a subtype. See Selecting a Type. Note:
    		When you select a Raw Material, design
											collaboration is turned off and disabled.
										 | 
 
					  
						| Name and 
						  AutoName Series | The part name. You can enter a name or allow the system to generate a
										name. Enter a unique part name into the
											Name field or select
											AutoName and choose an option
										from the AutoName Series list. Note:
    		
											If you enter a value in the Part
												Family field, the AutoName Series will be "Part
												Family" and you cannot enter a part name. The part
												name will be generated based on the requirements of
												the part family. 
										If the Production phase vs Development phase is
										selected, the revision is generated based on the phase's
										revision sequence. | 
 
					  
						| Title | The product name value that corresponds to
										the CATIA name. Enter a title. If left empty, the title will
										be shown as the part name. | 
 
					  
						| Description | Enter details that describe the new
						  part. | 
 
					  
						| Phase | Select either Development or
						  Production. | 
 
					  
						| Options - Enable Change Required | To enable change-required to a
										part when creating it, select "Enable Change Required" in
										the Create Part slide-in. For development phase parts,
											change-required is optional and you can either select or
											clear this box. This box is automatically selected and
											cannot be cleared when:  
											 
												 You create a child part for a parent part that
												is change-required. You select a change action in the
												Work Under Change field.
												The created part becomes change-required.  Note:
    		If you apply change-required to a part
											without selecting a Work Under Change while creating the
											part, you must still select a work under CA before you
											can edit the part.  When a part is under change-required, the associated
											CO/CA controls the release of the part.  Part revisions are treated independently. One revision of
											a part can be under change-required in one lifecycle
											state while another revision is in a different state or
											not under change-required at all.  | 
								
									| Options -
											Configured | Check this box to apply the Configured Part policy to the part. Clear
										this box to apply the EC Part policy. This field appears if
										Configured BOM Management is installed | 
 
					  
						| Work Under
							 Change | Assign a work under change action (CA)
						  to the part. The work under CA is required if you enable change-required;
						  otherwise, the work under CA is optional. See 
						  About Work Under Changes. | 
 
					  
						| Part Family | Click  to search for a part family to be associated with the
										part for classification purposes or for part number
										generation. The part name uses the name format that the part
										family defines. Note:
    		 If you select a part
											family, the AutoName Series will be "Part Family" and
											the AutoName check box will be selected.  | 
 
					  
						| Number of Parts | Enter the number of parts you want to create (up to 100). When creating
										multiple parts at the same time, you must either select an
										active part family that has the Name
										Generator attribute set to "On," or use AutoName and select
										an AutoName Series. | 
 
					  
						| Engineering | 
 
					  
						| Unit of Measure | Select a unit of measure and a unit of measurement type (Weight, etc.).
										You can select the type in the bill of materials only when
										adding a part using either the Insert
											Part > Insert as Child >
											New Part or Insert Part >
											Insert Below > New Part command. | 
 
					  
						| Estimated Weight | Type the estimated weight of the part
						  and select a unit of measure for the weight from the list. | 
 
					  
						| Target Release Date | Click  and select a target date for the part to become 
						  effective in the bill of materials. The actual effective date is
							 determined by the release date of the change object that releases the bill of
							 materials the part is used in. 
						   | 
 
					  
						| Supply Chain/Production | 
 
					  
						| Estimated Cost | The approximate, predicted cost of the
						  part per unit of measure. | 
								
									| Target Cost | Type the estimated cost per part. Select
										the currency. | 
								
									| Spare Part | Select Yes or No to specify whether the
										part is to be used as a spare. | 
								
									| Procurement Intent | Select "Make" if the part is to be made
										in-house. Otherwise, select "Buy". | 
								
									| Lead Time | From the list, select the time required to
										either obtain or manufacture the part. | 
								
									| End Item | Indicate whether the part is an end item. If Yes, this value
										will not be editable for subsequent revisions. This is shown
										only when Manufacturing BOM Management is installed. |