Prepare Optimization Model
- Creates a block model that stores the result attributes of pit optimization
scenarios.
- See Preparing an Optimization Block Model.
|

|
-
New Scenario
- See Flyout for New Scenario.
|

|
-
New Commodity
- See Flyout for Commodity.
|

|
-
Mining
- Defines mining parameters for scenarios that involve multiple
commodities.
- See Defining Mining Parameters.
|

|
- New processing
- See Flyout for Processing.
|

|
-
Economic Scenario
- Specifies the block valuation method, options for commodities and prices, the
mining cost value and how the scenario to be processed as per the ore selection
method.
- See Defining an Economic Scenario.
|

|
-
Pit and Phases
- Specifies options for defining the scheduling of the pit and phases.
Scheduling pit and phases involve:
- Selecting a single pit or phases.
- Defining and applying geometric constraints.
- Defining how the final pit looks.
- Specifying the number of phases.
- See Controlling Pit and Phases.
|

|
-
Slope
Profile
- Specifies slope parameters for the pit optimization of a single scenario.
- See Defining Slope Profiles.
|

|
-
Run Control
- Controls the block resolution when running a pit optimization.
- Aggregates blocks to accelerate the run.
- Controlling the Run Speed.
|

|
-
Scheduling
- Specifies the scheduling parameters.
- Scheduling is disabled by default. When scheduling is enabled, it is run after
the phases generation.
- Enabling Scheduling.
|

|
-
Run Pit Optimization
- Previews all parameters and runs the pit optimization and scheduling for the
selected scenario.
- See Running the Pit Optimization.
|

|
-
Pit Display
- Displays the resulting phases and periods of the scenario.
- See Displaying the Optimized Pit.
|

|
-
Scenario Output
- Copies the result attributes of the selected scenario to a new block model for
downstream usage.
- See Publishing Scenarios.
|