|
- Electrical Physical
System
- Inserts an electrical physical system
in your product structure.
See Inserting an Electrical Physical System.
|
 |
- Cable
- Inserts a PLM Cable in an electrical physical
system.
See
Creating a Cable.
|
 |
- Load Related Objects
- Loads in the session only the objects that are significant in the
routing process of your cables.
See
Loading Objects Related to Cables.
|
 |
- Associate Junction Point
- Associates a junction point with a cable to add a junction to a cable route.
See Associating Junction Points with Cables.
|
 |
- Routing
Assistant
- Facilitates the routing of
cable routes.
See
Managing Cable Routes.
|
 |
- Validate
- See Flyout for Managing Cable Routes Validation
|
 |
- Network Impact Assistant for Cable Routes
- Analyzes the impacts of network modifications on the routes of your
cables.
See
Managing Impacts on Cable Routes.
|
 |
- Cable Management Assistant
- Synchronizes cables with their cable routes to persist the validated routing
information of cable routes to their cables.
See
Synchronizing Cables with Cable Routes.
|